Full program, no payloadload
February 22, 2011
Work continues on the CNC mill – I’ve decamped from the sunlit halls of the Metropolitan Exchange, so the mill has been re-assembled in the unheated Undisclosed Location. Note the hair dryer – I discovered that some lubricating oils actually need to be above freezing to work correctly – the Z-stage requires a minute under the hair dryer before it will work.
Advertisement
No comments yet